Responsive image
DS10-26-47-CV
DS10-26-47-CV
DS10-26-47-CV
  • Quick Details
  • FAQ
  • Shipping details
  •  ref:10-26-47

    1.What do you offer?

    Drive Shafts
    Front Axle Shafts / Yoke Shafts / Cardan Shafts
    Pinion Yokes / Coupling Yokes
    Stub Tube Yokes / Weld Yokes / Sleeve Yokes / Flange Yokes
    Universal Joints
     
    2. Q: What’s the MOQ (minimum order quantity)?
    A:  500pcs or 3000USD.
     
    3. Q: What’s the best FOB price?
    A: Our price is made as per your drawing specification as well as the purchasing quantity.
     
    4. Q: What’s the lead time?
    A: Normally, it takes around 45-60 days.
     
    5. Q: Why the lead time is so long?
    A: One drive shaft part is made in around 20 machining processes. If every process takes 1 to 2 days, then it’s already at least 40 days. Not to say the forging and heat treatment time which take around 7 days min.
     
    6. Q: What’s the payment term?
    A: FOB Shanghai/Ningbo, paid by T/T. We will ask for down payment before production, and the balance paid off before shipment. Of course, we may also negotiate it.
     
    7. Q: What kind of packing can you provide?
    A: Tailor-made packaging method according to customer's requirement, otherwise, we will make the sea-worthy packing.
     
    8. Q: Which countries have you exported?
    A: American, Germany, Denmark, Spain, Holland, Italy, Japan etc.
     
    Service and quality information:
    9. Q: Can you make as per custom drawing?
    A: Yes, we can do that.
     
    10. Q: If I don’t have drawing, what can you do for me?
    A: If you don’t have drawing, but have the sample part, you may send us. We will check if we can make it or not.
     
    11. Q: How do you make sure the quality of your products?
    We will do a series of inspections, such as:
    1. raw material inspection (includes chemical and physical mechanical characters inspection),
    2. machining process dimensional inspection (includes: 1st pc inspection, self inspection, final inspection),
    3. heat treatment result inspection,
    4. gear tooth inspection (to know the achieved gear quality level)
     

     

    Packaging

    1) Inner packaging: pp bag, bubble bag, plastic wrap  etc.

    2) Outer packaging: carton,wooden case, pallet etc.

    3) As your requirement.

    Shipping

    1) Less than 50kg, you could choose express, such as DHL, UPS, FedEx, TNT and EMS. (door to door, so convenient)

    2) From 50kg to 200kg, you could choose to send by air. (fast and safe, but expensive)

    3) More than 200kg, you may consider to send by sea. (cheap, but long transit time)

    4) We can also deliver as client’s requirement.

    5) Nearest Port: Shenzhen Port

    6) We will choose the cheapest and safest way to ship the goods to you.

     
  • Responsive image
  • Our other related products

     

    Center Yokes
    Part#  Neapco Ref. Dana Ref. Type Series 
    DS10-26-47-CV   10-26-47 Center Yokes 1000
    DS 2-26-367-CV N2-26-367 2-26-497 Center Yokes 1310
    DS 26-757-CV N3-26-757 3-26-757 Center Yokes 1350
    CV Socket yokes
    DS-211342X-CV   211342X CV  yokes 1210
    DS-211355X-CV   211355X CV  yokes 1310
    DS-211544X-CV   211544X CV  yokes 1310
    DS-211229X-CV   211229X CV  yokes 1310
    DS-83288-2X-CV N2-83-288-2X   CV  yokes 1310
    DS-211543X-CV   211543X CV  yokes 1310
    DS-211545X-CV   211545X CV  yokes 1310
    DS-21179X-CV   211179X CV  yokes 1330
    DS-211996X-CV   211996X CV  yokes 1330
    DS-21163X-CV   211631X CV  yokes 1330
    DS-211913X-CV   211913X CV  yokes 1330
    DS-212024X-CV   212024X CV  yokes 1350
    DS-83-025X-CV N3-83-025X   CV  yokes 1350
    DS-212019X-CV   212019X CV  yokes 1350

    Hangzhou Ding Shun mechanical Co., Ltd.

    Tel:086-571-83581166

    Fax:086-571-82519588

    E-mail:info@cntison.com

    Add:Linpu Town, XiaoShan , HangZhou, ZheJiang

    Web:www.cntison.com

         

    浙ICP备11017104号      COPYRIGHT© CNTISON.COM.ALL RIGHTS RESERVED

    Power by rswl