Responsive image
JW rear axle shaft
JW rear axle shaft
JW rear axle shaft
  • Quick Details
  • FAQ
  • Shipping details
  • 1.What do you offer?

    Drive Shafts
    Front Axle Shafts / Yoke Shafts / Cardan Shafts
    Pinion Yokes / Coupling Yokes
    Stub Tube Yokes / Weld Yokes / Sleeve Yokes / Flange Yokes
    Universal Joints
     
    2. Q: What’s the MOQ (minimum order quantity)?
    A:  500pcs or 3000USD.
     
    3. Q: What’s the best FOB price?
    A: Our price is made as per your drawing specification as well as the purchasing quantity.
     
    4. Q: What’s the lead time?
    A: Normally, it takes around 45-60 days.
     
    5. Q: Why the lead time is so long?
    A: One drive shaft part is made in around 20 machining processes. If every process takes 1 to 2 days, then it’s already at least 40 days. Not to say the forging and heat treatment time which take around 7 days min.
     
    6. Q: What’s the payment term?
    A: FOB Shanghai/Ningbo, paid by T/T. We will ask for down payment before production, and the balance paid off before shipment. Of course, we may also negotiate it.
     
    7. Q: What kind of packing can you provide?
    A: Tailor-made packaging method according to customer's requirement, otherwise, we will make the sea-worthy packing.
     
    8. Q: Which countries have you exported?
    A: American, Germany, Denmark, Spain, Holland, Italy, Japan etc.
     
    Service and quality information:
    9. Q: Can you make as per custom drawing?
    A: Yes, we can do that.
     
    10. Q: If I don’t have drawing, what can you do for me?
    A: If you don’t have drawing, but have the sample part, you may send us. We will check if we can make it or not.
     
    11. Q: How do you make sure the quality of your products?
    We will do a series of inspections, such as:
    1. raw material inspection (includes chemical and physical mechanical characters inspection),
    2. machining process dimensional inspection (includes: 1st pc inspection, self inspection, final inspection),
    3. heat treatment result inspection,
    4. gear tooth inspection (to know the achieved gear quality level)
     

     

    Packaging

    1) Inner packaging: pp bag, bubble bag, plastic wrap  etc.

    2) Outer packaging: carton,wooden case, pallet etc.

    3) As your requirement.

    Shipping

    1) Less than 50kg, you could choose express, such as DHL, UPS, FedEx, TNT and EMS. (door to door, so convenient)

    2) From 50kg to 200kg, you could choose to send by air. (fast and safe, but expensive)

    3) More than 200kg, you may consider to send by sea. (cheap, but long transit time)

    4) We can also deliver as client’s requirement.

    5) Nearest Port: Shenzhen Port

    6) We will choose the cheapest and safest way to ship the goods to you.

     
  • Responsive image
  • Our other related products

     DANA 30  FRONT AXLE SHAFTS/KIT 

     

    Application Spline Side LH Length RH Length Out Stub Length Outer Stub U-joint
    Jeep CJ 76-81 27  27 LH/RH  27.02"  14.14"  8.72"  27 5-760X
    Jeep CJ 76-81 Big Spline Upgrade 30 LH/RH  27.02"  14.14"  8.72"  27 5-760X
    Jeep CJ 82-86 27 Spline 27 LH/RH  28.69"  15.82"  8.72"  27 5-760X
    Jeep CJ 82-86 Big Spline Upgrade 30 LH/RH 28.69"  15.82"  8.72"  27 5-760X
    Jeep YJ/TJ/XJ 27 Spline w/Disconnect Eliminator*  27 LH/RH  16.50"  32.31"  6.11"  27 5-760X
    Jeep YJ/TJ/XJ Big Spline Upgrade w/Disconnect Eliminator*  30 LH/RH  16.50"  32.31" 6.11"  27 5-760X
    Jeep JK 07-Up Non-Rubicon 27 LH/RH  18.8"  34.6" 6.25" 32 5-760X

     

    DANA 44  FRONT AXLE SHAFTS/KIT

    Application Spline Side LH Length RH Length Out Stub Length Outer Stub U-joint
    Ford F-150 68-79, Bronco 78-79  30 LH/RH  18.91"  33.91"  9.72 19 5-760X
    Ford Bronco 71-77  30 LH/RH  18.31"  27.94"  9.72 19 5-760X
    Ford F-250 76-79 Open Knuckle Only 30 LH/RH  18.62"  34.75"  9.72"  19 5-760X
    GM K10 & K20 71-81 30 LH/RH  36.61”  18.31”  9.94”  19 5-760X
    Jeep Wagoneer 74-79 w/ Disc  30 LH/RH  33.19"  14.69"  9.94"  19 5-760X
    Jeep Wagoneer 80-92  30 LH/RH  15.80"  32.12"  9.94"  19 5-760X
    Jeep TJ Rubicon 03-06  30 LH/RH  16.90"  31.88"  6.11"  27 5-760X
    Jeep JK Rubicon 07-Up  30 LH/RH  19.90"  33.60"  6.25"  32 68017182AA
    Scout II 73-80  30 LH/RH  32.91"  14.78"  8.72"  27 5-760X

     

    DANA 66  FRONT AXLE SHAFTS/KIT

    Application Spline Side LH Length RH Length Out Stub Length Outer Stub U-joint
    77-91 GM K30 w/Dana 60 35 LH/RH 35.1 17.67 12 35 SPL55-3X
    75-93 Dodge W300/W350 35 LH/RH 35.1 15.98 12 35 SPL55-3X
    78-79 Ford F250/F350 35 LH/RH 18.66 34.56 11.4 35 SPL55-3X
    86-97 Ford F350 35 LH/RH 15.98 36.68 11.4 35 SPL55-3X

    Hangzhou Ding Shun mechanical Co., Ltd.

    Tel:086-571-83581166

    Fax:086-571-82519588

    E-mail:info@cntison.com

    Add:Linpu Town, XiaoShan , HangZhou, ZheJiang

    Web:www.cntison.com

         

    浙ICP备11017104号      COPYRIGHT© CNTISON.COM.ALL RIGHTS RESERVED

    Power by rswl